aelogo



ABOUT US    |    NEWS    |    CONTACT US    |    CAREERS    |    SITE INDEX      
 
  COMMERCIAL AND
  INDUSTRIAL
  MOTORS AND DRIVES   BUILDINGS   TRANSPORTATION   N.C. GREENPOWER   QUICK LINKS  
ABOUT US
CONSULTING
TRAINING
TESTING
RESEARCH
KNOWLEDGE LIBRARY
CLIENTS
EXPERTS
NEWSLETTER

Motors and Drives

Motor Management

The operating cost (electricity used) by a motor over a projected 10-year life is 95 to 97 percent of the total lifecycle cost. That's why developing a sound motor management policy that determines when, whether, and how motors should be replaced and repaired is a wise investment.

Advanced Energy's Services

Advanced Energy specialists have the knowledge and experience to develop unbiased motor management policies for any company. These policies define the appropriate repair and replacement actions based on the company's specific motor applications and unique economic factors.

With our accredited test lab, Advanced Energy is also able to evaluate motors to solve specific performance and application issues.

Our goal is to help you remain competitive in the marketplace. We offer a variety of motor management services to assist with both short- and long-term motor management needs that increase productivity and lower operating costs.

Policy Components

Our specialists assist clients with establishing various types of policies to insure that motors are being managed for optimum cost-effectiveness. Policy components are customized to best meet the clients needs from the very basic to comprehensive. Examples of our policy development services include:

  • Purchase and repair policies
    Development of new motor purchase and motor repair specifications to ensure quality and reliability. May also include a qualification of new motor brands and certification of motor repair service providers.
  • Repair vs. replacement policies
    The decision to repair or replace a motor that has failed has a direct impact on operating costs and reliability. Evaluating motors and making the repair vs. replace decision in advance of their failure avoids panic driven decisions which are costly in the long run.
  • Spare motor inventory and replacement motor availability policies
    Assuring that the right motors are available in a timely manner so that the quickest resolution to a motor failure is critical to an effective motor management policy.
  • Other motor management policy components may include:
    • Horsepower breakpoint determination
    • Motor inventory analysis
    • Critical motor planning
    • Motor surveys and tagging
    • Tracking system
    • Preventive and predictive maintenance
    • Client-specific cases

For More Information

Please contact Kitt Butler or David Berkowitz at 800 869-8001 or to learn more about how Advanced Energy can support your needs.

 

 

CASE STUDY


Replacement Metric Motor Test

A potential replacement for a metric loom motor was tested and determined to be no more efficient than the original metric motor, and in fact ran with 1.7% lower speed. Using this motor would have provided no reliability improvement and would have resulted in reduced production.

   919 857-9000    |    800 869-8001 [toll free]    |    919 832-2696 [fax]
   909 Capability Drive, Suite 2100    |    Raleigh, NC 27606-3870
Creating economic, environmental and societal benefits through   
innovative and market-based approaches to energy issues